Construction, Maintenance and Build-out of the Pine Mountain Trail
Saturday, November 17, 2012
Comfortable fall day with lots of sunshine. Finished attaching the last of the metal roof panels. We began the framing of the gable ends for the board and batten siding. Smaller crew....so a slower pace.